Flat roofing

Flat roofing in EPDM, GRP and felt

New and replacement flat roofs for extensions, garages, dormers and commercial buildings, insulated to current standards and finished properly at every edge.

Systems

Choosing a flat roof system

We fit all three. Which one suits depends on the size of the roof, whether it'll be walked on, and the budget.

SystemWhat it isTypical lifespanGood to know
EPDM rubberA single sheet of synthetic rubber, bonded to the deck20 to 30 years or moreFew or no joints, and stays flexible in cold weather
GRP fibreglassResin and glass matting laid on site, finished with a topcoat20 to 30 years or moreSeamless and hard-wearing, so it copes with foot traffic
Torch-on feltLayers of modified bitumen felt, heat-welded in place15 to 20 yearsTraditional and economical, with a mineral finish against UV

Lifespans depend on how well the roof is laid and looked after.

Build-up

What goes into a warm flat roof

Most replacement flat roofs are built as a warm roof, with the insulation above the deck so the timbers stay warm and dry.

Deck
OSB3 or plywood boards over the joists
Vapour control
Stops moisture from the room reaching the insulation
Insulation
Rigid PIR boards to the thickness required
Waterproofing
EPDM, GRP or felt
Upstands
Turned up the walls and dressed under a lead cover flashing
Edges
Trims, drips, outlets and gutters to get the water off cleanly
Modern building with a flat roof

Warning signs

When a flat roof needs attention

  • Standing water

    Puddles still there two days after rain mean the roof has sagged or the outlets are blocked.

  • Splits, blisters and cracks

    Felt that has blistered or split, and cracked GRP, let water under the surface.

  • Damp patches inside

    Stains on the ceiling below are often the first sign, and the leak may be some way from the stain.

  • Moss and plants

    Anything growing on a flat roof is holding water against it and working its roots into the surface.

  • Lifting edges

    Trims and upstands coming away let wind-driven rain straight in.

Process

Replacing a flat roof

Most domestic flat roofs are stripped and replaced in a few days, weather allowing.

  1. Step 1

    Strip

    The old covering comes off and the deck is checked.

  2. Step 2

    Deck

    Soft or rotten boards are replaced and any falls corrected.

  3. Step 3

    Insulate

    Vapour control and PIR insulation, to current standards where required.

  4. Step 4

    Waterproof

    EPDM, GRP or felt laid and dressed up the walls.

  5. Step 5

    Finish

    Trims, lead cover flashings, outlets and gutters, then a full clean-up.

Questions

Flat roof questions

Do I need Building Regulations for a new flat roof?

If most of the roof is being replaced, the insulation usually has to be brought up to current standards and Building Control needs to know. We'll tell you whether yours is affected when we survey it.

Can you repair it rather than replace it?

Often, yes. A split or a failed edge can usually be repaired. If the deck underneath has gone soft, or the roof is failing in several places, replacement is better value.

Can a flat roof be walked on?

GRP copes best with foot traffic. For a roof that will be used regularly, such as a balcony, it needs to be designed for it from the start.

Flat roof letting water in?

Book a survey and we'll tell you whether it's a repair or a replacement.