Leaking roof? Call 07700 900482

Commercial and contract enquiries Chester, Cheshire and Flintshire
RidgelineRoofing

Commercial

Commercial and contract roofing

Planned maintenance, reactive repairs, re-roofs and flat roof replacement for landlords, housing providers, schools, churches, councils and commercial buildings. Every job is reported with photos.

Clients

Who we work for

Roofing for anyone responsible for buildings that other people live, work or study in.

  • Landlords and letting agents

    Repairs reported by tenants dealt with and closed off with photos, so you have a record for each property. We can arrange access with the tenant direct.

  • Housing providers

    Planned and reactive work across houses and flats, reported property by property.

  • Schools and colleges

    Work programmed around term dates, with the work area fenced off from pupils and staff.

  • Churches and listed buildings

    Slate and lead repairs in matching materials, with lead-free alternatives where theft is a risk. Slate and leadwork

  • Commercial and industrial buildings

    Flat roofs, gutters, outlets and flashings on shops, offices, workshops and units.

  • Councils

    Repairs and planned work on council buildings, carried out to the specification and paperwork the contract sets.

Planned maintenance

Planned roof maintenance

Most roof failures start small: a blocked outlet, a slipped slate, a split in a flat roof. Regular visits catch them before they let water into the building.

Inspection
Slates, ridges, flashings, flat roofs and outlets checked, from a cherry picker where we can
Gutters and outlets
Cleared, with the downpipes checked
Small repairs
Minor faults fixed on the visit, up to a spending limit you set
Report
Photos of each roof and a list of what needs doing next, in order of urgency
Timing
Visits booked to suit the building, such as school holidays or quiet periods
Row of stone houses with slate roofs in a green valley

Reactive repairs

When something fails

The first job is to stop the water. The permanent repair is priced and approved before it goes ahead.

  1. Step 1

    Report

    Call or WhatsApp with the address, the problem, and who to contact for access.

  2. Step 2

    Make safe

    Leaks and storm damage made safe, to stop any further damage to the building.

  3. Step 3

    Price

    Photos of the cause and a price for the permanent repair, against your order number if you use them.

  4. Step 4

    Repair and close

    The repair carried out and closed off with photos for your records.

How a commercial flat roof is built A drawing of a two-storey commercial building, cut away at the front corner to show its warm flat roof: a profiled steel deck, a vapour control layer, tapered insulation boards laid to falls, a single-ply membrane dressed up the parapet walls under a metal coping, outlets at the low points, a rooflight with a guard rail round it, and walkway pads from the roof hatch. Profiled steel deck Vapour control layer Tapered insulation Single-ply membrane Upstand and coping Rooflight and outlets Walkway and guard rail

Drawing 02 · Commercial flat roofs

A warm roof, from the deck up

How we build and replace flat roofs on schools, offices and industrial units, cut away at the corner so you can see each layer.

  1. 01Steel deck

    Most commercial flat roofs sit on a profiled steel or concrete deck. We check its condition and fixings before anything new goes on top.

  2. 02Vapour control layer

    Bonded to the deck, it stops warm, damp air from inside the building reaching the insulation and condensing there.

  3. 03Tapered insulation

    Rigid PIR boards cut to falls, thinner towards the outlets, so rainwater runs off instead of sitting on the roof.

  4. 04Single-ply membrane

    Wide sheets with heat-welded laps. Light, quick to lay over a large roof, and long-lasting when it's detailed properly.

  5. 05Upstands and coping

    The membrane is dressed up the parapet walls and held with a termination bar, with metal coping on top to keep water out of the wall.

  6. 06Outlets and rooflights

    Outlets sit at the low points of the falls. Rooflight upstands are sealed into the membrane so water runs round them, not through.

  7. 07Walkway and guard rail

    Walkway pads mark a safe route from the roof hatch, and a guard rail keeps people away from the rooflight, which isn't built to take weight.

    Talk to us about a commercial roof

Larger work

Re-roofs and flat roof replacement

Larger jobs are planned around the building, so it can stay in use while the work goes on.

Flat roof replacement

Old coverings stripped and replaced as a warm roof in single-ply, EPDM, GRP or felt, insulated to current standards where Building Regulations apply. Flat roofing

Slate re-roofs

Stripped to the rafters, with new membrane and battens, then re-slated with salvaged slate made up with new or reclaimed. Re-roofing

Phased work

Big roofs done a section at a time, with each section left watertight at the end of the day, so the rooms below stay in use.

Paperwork

Paperwork and site safety

Contract work comes with the records your organisation needs, and a site set up so that the public, pupils and tenants are kept clear of the work.

For short jobs we work from a cherry picker. Longer jobs get scaffold with edge protection. Cherry picker access

Before work
Risk assessment and method statement for the job, on request
On site
Work areas fenced or coned off, and entrances and access routes kept clear
Records
Photos before, during and after, with a short written report
Invoicing
One invoice per property, against your order number

Questions

Commercial questions

Can you work while the building is in use?

Usually, yes. We fence off the area below the work, keep entrances clear, and plan noisy or disruptive work for holidays or quiet periods where we can.

Do you take on single properties, or only portfolios?

Both. One rented house is reported and invoiced the same way as a block of flats.

What does a photo report include?

The address and date, photos of each roof and every defect found, what was done on the visit, and a price for anything that still needs doing.

Do you work on listed buildings and churches?

Yes, in matching slate and lead. Listed building consent, or a faculty for a church, may be needed before work starts. We can supply the details of materials and method that the application asks for.

Can you replace stolen lead?

Yes. The roof is made watertight first, then the lead is replaced, or a lead-free alternative is fitted if it's likely to be targeted again. We can provide photos and a report for the insurance claim.

Responsible for more than one roof?

Tell us about the buildings and we'll arrange a survey, then put together a maintenance plan to suit.